Commercial Water Extraction

This water loss was a two story water extraction and mold remediation project at Riverside Community College. Both floors had extensive damage and required daily monitoring, psychrometric readings and moisture mapping. Brickley Environmental was contracted by the college to do all of the remediation work and CA Construction provided all structure drying, dehumidification and reconstruction work to both floors.